Hilton Hotel

2026-05-19 11:19:48
أحدث حالة شركة حول Hilton Hotel

Hilton Hotel

From signing to delivery, every step is strictly controlled for quality.

Signing stage: Confirm core terms such as technical specifications, fire rating, delivery time, etc. with the hotel, clarify the responsibilities and acceptance standards of both parties.

Design phase: Conduct on-site measurements of door opening dimensions, customize door types, color palettes, and hardware configurations based on hotel decoration style, provide detailed drawings, and confirm sealing samples.

Production stage: Selected environmentally friendly substrates are refined through more than 20 processes including cutting, framing, filling, hot pressing, pasting, and spraying. Each door has been tested for fire resistance, sound insulation, and scratch resistance.

Installation stage: After on-site re measurement by a professional team, installation is carried out, and the hinges and door locks are debugged to ensure smooth opening and closing, and tight sealing. After installation, carry out finished product protection and overall acceptance, and deliver for operation on time.